Illustration
Beny BCPCM-AT2N-P
Beny with MID meter and 4G, 5 m cable
11 kW5 m cableMID4GRFID
RSD 119,900
Available to order. Delivery 6–8 weeks after payment.
Pay only after we confirm. We confirm the price and date by message or email within 48 hours.
Free delivery. By courier anywhere in Serbia.
Your rights by law: 14 days to withdraw and 2 years of seller liability for conformity.
Manufacturer’s warranty: 3 years (validity in Serbia confirmed before you pay).
At a glance
A charger with a built-in MID meter and 4G, for garages without Wi-Fi and for buildings where charging energy is metered and shared.
- Tethered 5 m Type 2 cable: park and plug in.
- 11 kW on a three-phase 3 × 16 A line: the full AC rate for most EVs.
- TÜV Rheinland certified (EN IEC 61851-1), with an EU declaration of conformity.
- Built-in MID-certified meter records energy for the monthly statement.
- 4G: the charger stays online without Wi-Fi wherever there is mobile signal.
- RFID reader: charging starts with your card, handy in a shared garage.
Overnight charging
How fast your car fills up on this charger if you plug in at 10 pm.
Charging 20 → 80%
10 pm7 am
1:40 amFull by
3 h 38 minDuration
55 kmRange per hour
Assumes 18 kWh per 100 km and 10% charging losses. Real times depend on the car, temperature and wiring.
Specifications
- Power
- 11 kW (3 × 16 A, 400 V), set at the factory
- Vehicle connector
- Type 2, 5 m cable
- Residual current protection
- 6 mA DC (RDC-DD), built in
- Energy meter
- MID-certified, built in
- Connectivity
- Wi-Fi, Ethernet, Bluetooth and 4G
- Protocol
- OCPP 1.6J
- RFID reader
- yes, 2 cards included
- Screen
- 5"
- Package
- 470 × 380 × 300 mm, 15 kg
- Manufacturer’s warranty
- 3 years (validity in Serbia confirmed before you pay)
In the box and installation
In the box
Charger with 5 m cable, wall bracket, 2 RFID cards, manual in Serbian.
What installation needs
You need a three-phase 3 × 16 A line. Basic installation next to your panel (up to 2 m of cable, RCD and breaker) starts at RSD 24,000. No separate MID meter needed.
With the Evolako app
- Evolako monthly statement
- yes, the meter is built in; reading it over OCPP is not yet verified
- Control from the Evolako app
- over OCPP 1.6J; not yet tested with our app
Product information
Manufacturer: Zhejiang Benyi New Energy Co., Ltd.
Country of origin: China
Importer: ANDREI SMEKHOV PR NOVI SAD (Evolako), Kopernikova 56, 21000 Novi Sad, Serbia
A Serbian manual and declaration come with the product.